feat(cae): periodic node pairing, beam mesh and Nedelec edge mesh handoff (VDE-1619/1621/1620)
Wave 3 of the feedback implementation plan (3 parallel agents + integration);
completes the "not implemented" list of docs/reference/feedback-audit-2026-11-19.md.
VDE-1619 (P2): pair_periodic_nodes -- translational/rotational(Rodrigues)/mirror
1:1 pairing of boundary face nodes; greedy nearest with ambiguity rejection
(whole request fails, no partial output), unmatched lists, no exceptions,
deterministic; 8/8 tests.
VDE-1621 (P2): beam_mesh -- B-Rep to centerlines (analytic cylinder axis ->
faceted prism axis inference -> straight-edge fallback) -> Line2/Line3 elements
with section assignment, junction/end nodes, local axes, Line3 midpoints;
9/9 tests.
VDE-1620 (P3): edge_element_mesh -- global unique edge table, tetra_edges +
tetra_edge_sign direction contract (v-u == sign*(b-a)), B-Rep edge tags,
boundary face edges for PEC; Nedelec1 explicitly rejected (no silent
degradation); 8/8 tests.
Docs: api-reference-mesh +149 lines (3 API contracts), wave-3 parallel
implementation report, remaining-gaps closed list + record, feedback-status
batch entries, ticket appendices.
Verification: full Release build exit 0; 23-suite integration 847 tests passed
0 failed; PR gate 930/930 (104.10 s).