Files
ViewDesignEngine/docs
hm e13541fcac
pr-quality / static-gate (workflows + docs claims + coverage plan) (push) Canceled after 0s
pr-quality / coverage-gate (core-pr measured baseline, opt-in) (push) Canceled after 0s
pr-quality / fast-gate (build -> core-pr tests -> determinism) (push) Canceled after 0s
docs: record 1.0.476 merge re-verification for wave9
Rebased onto f8056b1c (1.0.476 KCP Wave9, 16 commits, no conflicts). Post-merge: full Release build MERGEBUILD_EXIT=0 (467.8 s); 23 suites 870 passed / 0 failed (214.9 s, per-suite identical); PR gate 1011/1011 (99.52 s; +6 upstream tests). Docs now carry merge-verification numbers and final HEAD.
2026-11-20 19:16:44 +08:00
..