Files
ViewDesignEngine/docs/planning
hm 3eef3d168b
pr-quality / static-gate (workflows + docs claims/index + coverage plan) (push) Canceled after 0s
pr-quality / coverage-gate (core-pr measured baseline, opt-in) (push) Canceled after 0s
pr-quality / fast-gate (build -> core-pr tests -> determinism) (push) Canceled after 0s
docs: record 1.0.488 merge re-verification
Rebase Wave16 (3cfeb589 + 757f86ba) onto origin/main 1355d089 (1.0.488,
+17 commits; src/ changes limited to boolean/SSI files, no overlap with the
CAE/mesh Wave16 write scope) without conflicts.

Re-verification on the merged tree:
- full build MERGEBUILD_EXIT=0 (8.3 min)
- 23 suites 909 PASSED / 0 FAILED (test_fea_mesh 101 pass / 2 env skips)
- PR gate 1022/1022 (85.45 s)
- four KPI windows bit-identical to pre-merge: fixed 191/41 (717,759 ms),
  auto 190/42 (1,077,686 ms), band fixed 8/0 (91,496 ms), band auto 8/8
  (101,686 ms); per-file diff all zero
- red-line volumes unchanged (PWB 120000.000000/112372.130423/65696.177198,
  plate 530575.629492, l-bracket 96858.544122, HEAD_FRONT 22247.671788,
  SpringEnd 1.458958/1.437906, Bolt 8.043146/8.028775, washers
  3.603139/4.674785/4.008154)
- docs gates PASS (42 claims/0 warnings; index 1.0.488/report 554/wave 21)

Updated wave16 report sections 6-7, cae-corpus-kpi section 3.14 spot check +
section 8 rows, remaining-gaps and feedback-status merge lines.
2026-11-22 07:22:52 +08:00
..
2026-11-21 15:01:33 +08:00